| Follow the laying order. Secure each row with adhesive to ensure stability. For corners cut module C and D in half. | |
![]()
|
Lay the first four modules as
illustrated (A, B, C and D). For each row 2 through 4 proceed as shown.
Starting from the fifth row, lay as for the first row, followed by the
next ones until the desired height is reached. Each pillar has sides of
734mm. It is recommended that only 90mm or 135mm modules be used. |
![]() |
Pillar may be capped using Celtik
straight capping modules. If a lighted pillar is desired make sure all electrical wiring is completed before the modules are laid. If flowers are to be planted atop the pillar, install a geotextile membrane inside the pillar before filling with earth. Note: the dimensions of the imperial system are approximations. |
|
|